Bơm công nghiệp
SHIMGE Pump Industry assists the upgrading of process equipment and facilities at Erenhot Wastewater Treatment Plant
Trang chủ Blog

SHIMGE Pump Industry assists the upgrading of process equipment and facilities at Erenhot Wastewater Treatment Plant

SHIMGE Pump Industry assists the upgrading of process equipment and facilities at Erenhot Wastewater Treatment Plant

November 24, 2026

SHIMGE Pump Industry 

Outstanding Case Studies:

Supporting the Erlianhot City Wastewater Treatment Plant in upgrading and renovating its process equipment and facilities.

Solution configuration: A total of 15 units of pumping equipment will be selected, including 10 horizontal double-suction pumps of the SGSNN series, 3 vertical pipeline pumps of the SGL series, and 2 vertical multistage pumps of the BLTE series, in order to meet the needs for upgrading and renovating process equipment and facilities at the plant site in areas such as emergency support, winter operation, and the plant's environmental conditions.

Insulation canopy for the biochemical tank and the deodorization equipment room

Application scenario: Primarily used for the newly constructed 10,000 m² accident emergency pool and the 8,323.08 m² area within the plant site.

Project progress: The renovation and upgrade project for the process equipment and facilities at this plant site was fully completed by the end of October this year.

Advantages: High energy-saving and consumption-reduction efficiency; improved efficiency in wastewater treatment; reduced operation and maintenance costs.

 

Part 01

Project Background/Project Context

 

The Erlianhaote Wastewater Treatment Plant is located in Xilingol League, Inner Mongolia Autonomous Region. For a long time, the plant has faced operational and maintenance challenges, including high energy consumption costs and bottlenecks in its treatment capacity.

 

pain point①

High energy consumption costs: The equipment at this plant has been in operation for a long time, and motor efficiency has declined significantly. The equipment has been operating under high load for 24 hours continuously over an extended period, resulting in persistently high electricity costs.

 

pain point②

Treatment capacity has reached a bottleneck: In some key process stages (such as the inflow and recirculation of water in the main pipelines), the flow rates and head of the existing pump sets cannot meet the growing demand for wastewater treatment. This limits the overall treatment efficiency and creates a risk of overflow.

 

Part 02·Solution

SHIMGE offers a wide range of high-efficiency, energy-saving pump units.

 

SHIMGE provides 15 pump-type pieces of equipment specifically tailored to the requirements.

·10 horizontal double-suction pumps in the SGSN series

The double-suction impeller design provides a high flow rate and excellent cavitation performance.

 

· 3 units of SGL series vertical pipeline pumps & 2 units of BLTE series vertical multistage pumps

Compact structure and small footprint

 

To this end, the plant site initiated a project to update and upgrade its process equipment and facilities. As part of this initiative, SHIMGE provided the customer with 15 pumps tailored to its needs: 10 SGSN-series horizontal double-suction pumps, 3 SGL-series vertical pipeline pumps, and 2 BLTE-series vertical multistage pumps.

 

SGSN Series Horizontal Double-Suction Pumps

 

 

The double-suction impeller design delivers high flow rates and excellent cavitation performance. It can be precisely matched to the stable transportation requirements of the main pipelines in large-scale wastewater treatment plants, thereby overcoming bottlenecks in wastewater transportation.

 

SGL series vertical pipeline pumps & BLTE series vertical multistage pumps

 

 

Its compact design and small footprint enable it to meet the requirements for precision conveying and high head, ensuring seamless integration of the entire process.

The pump sets selected in this project proposal are paired with high-efficiency hydraulic models optimized through CFD flow-field simulations. This effectively expands the high-efficiency operating range of the water pumps. The project also adopts an energy-saving motor solution in accordance with the new national standard, thereby improving the overall energy efficiency of the system and addressing the issue of high energy consumption at its root.

 

Part 03·Outcomes of the Plan 

Supporting the optimization of operational indicators and the improvement of environmental benefits

 

The SHIMGE project proposal will effectively contribute to further optimizing key indicators at the plant site, including energy conservation and consumption reduction, wastewater treatment capacity, and O&M costs, while also promoting improvements in local environmental benefits.

 

 

·Energy saving, reduced consumption, and high efficiency

Based on the total equipment power of 831 kW, assuming continuous 24-hour operation of the wastewater treatment plant and an annual operating time of 8,000 hours, the overall operating efficiency of the new equipment is expected to increase by approximately 15% compared with the old equipment. The estimated annual electricity savings would be approximately 997,000 kWh, equivalent to a reduction in carbon dioxide emissions of approximately 812 t (calculated at 0.815 kg/kWh), thereby providing strong support for the development of a green, low-carbon city.

 

· Enhancing the efficiency of wastewater treatment

The pump set operates stably and offers high adaptability; the maximum flow rate of a single pump can reach 1,121 m³/h. It can meet the domestic wastewater treatment needs of approximately 70,000 residents in Erlianhot City and the surrounding areas, effectively improving the regional water environment quality.

 

· Operational and maintenance costs have decreased.

It is expected that the number of unplanned downtime events caused by equipment failures will be reduced by more than 20 events per year, thereby lowering maintenance intensity and subsequent operation and maintenance costs, and helping the plant better advance precision operations and water-quality compliance management.

 

In the future, SHIMGE will systematically organize the mature solutions developed in this project into standardized solutions and promote them at similar wastewater treatment plants in surrounding high-altitude, cold-climate regions. In line with the "dual carbon" goals, SHIMGE will also continue to increase its R&D investment in high-efficiency motors, hydraulic models, and energy-saving pump sets. It will further deepen its green and low-carbon cooperation with plant operators and industry customers, jointly advancing the wastewater treatment industry toward greener, lower-carbon, and smarter development.

để lại tin nhắn

để lại tin nhắn
Nếu bạn quan tâm đến sản phẩm của chúng tôi và muốn biết thêm thông tin chi tiết, vui lòng để lại tin nhắn ở đây, chúng tôi sẽ trả lời bạn sớm nhất có thể.
nộp

Trang chủ

Các sản phẩm

WhatsApp

liên hệ